Bus Lot Solar Array

Description: Named for its prior life as a vehicle staging area, the Bus Lot site sat largely unproductive before Zero Point developed it into a 700-kilowatt solar array. Paired with the nearby Pumpkin Patch and Paddock installations, the Bus Lot array is part of a cluster of Zero Point projects that collectively generate significant renewable capacity across Charlton. At 897,000 kilowatt-hours per year, Bus Lot offsets an estimated 736 tons of CO2 annually.

Project Info

LocationCharlton, MA
Size0.7MWdc, 0.5MWac
Estimated Production897,000 kWh/year

Please note that these estimates are approximate and are not being used for emission inventory or formal carbon footprinting exercises. These estimates were calculated using the Greenhouse Gas Equivalencies Calculator provided by the EPA in November, 2018.